How should budgeting, scheduling, and resource loading or leveling be most logically accomplished in

  • How should budgeting, scheduling, and resource loading or leveling be most logically accomplished in terms of their chronological order?
  • How would resource-constrained scheduling help, hinder, or change your recommendations?
  • What are some potential problems with the top-down and bottom-up budgeting processes? What are some ways of dealing with these potential problems?
  • In preparing a budget, what indirect costs should be considered?
  • What characteristic(s) of the critical path times makes them critical?
  • What two factors are compared by Gantt charting? How does the Gantt chart differ in purpose from the project master schedule?
  • Contrast total slack and free slack.
  • What is the average resource load factor? How is it used to determine project completion times?
  • What are two methods for addressing the constrained resource allocation problem?
    • Posted: 4 years ago
    • Budget: $999999.99

    0 replies

    Leave a Reply

    Want to join the discussion?
    Feel free to contribute!

    Leave a Reply

    Your email address will not be published. Required fields are marked *